Raeburn Drilling have carried out drilling works for numerous large geothermal developments over the last 10 years. In that time we have developed the project management skills and working methods needed to work successfully in large, often congested, sites.
Large projects require the use of cost effective, efficient and well maintained drilling plant. Our fleet of 15 rotary drilling rigs means we have the capacity to handle the largest projects.
Raeburn have developed a safety and management culture suited to working successfully on large projects. The majority of these projects are managed by members of the UK Contractors Group, an organisation whose members include the largest major civil engineering contractors working in the UK.
A few of the Projects we have worked on are listed below:
| Site | Scope of Work |
|---|---|
| Heathrow X2 Project | 36no.100m deep boreholes installed with double geothermal loops |
| Ikea, Coventry | 4no. 150m deep, 400mm diameter water wells for use in an open loop geothermal heating system
|
| Gloucester Police Headquarters, Gloucester | 80no. 100m deep boreholes installed with double geothermal loops |
| Saint Martins in the Fields Church, London | 2no. 150m deep, 400mm diameter water wells for use in an open loop geothermal heating system |
| Hull College, Hull | 19no. 100m deep boreholes installed with double geothermal loops |

